WASD & FDOT Utility Engineering
Utility work in a state roadway is not just excavation and pipe. It is agency requirements, traffic control, inspections, testing, sequencing, restoration and field coordination all happening in a restricted work window.
12-inch WASD main tap — SW 7th Street
DoubleDay tapped an existing 12-inch water main on SW 7th Street to feed a new 6-inch fire hydrant line and a 4-inch fire sprinkler service.
FDOT-controlled roadway work
The operation required nighttime construction under strict FDOT requirements, including roadway access, excavation, traffic constraints and restoration obligations.
Miami-Dade WASD coordination
Water utility work was executed around WASD requirements for tapping, installation, inspection, testing and acceptance.
Field leadership
Francisco Rubio has coordinated the field operation through excavation, main-tap work, utility installation, inspections, crew sequencing and restoration.
Talk to an engineer
Send the project address, current condition, deadline and any agency or building-department comments. Contact DoubleDay Engineering or call 305-209-2396.