Utility work in a state roadway is not just excavation and pipe. It is agency requirements, traffic control, inspections, testing, sequencing, restoration and field coordination all happening in a restricted work window.

WASD & FDOT Utility Engineering

12-inch WASD main tap — SW 7th Street

DoubleDay tapped an existing 12-inch water main on SW 7th Street to feed a new 6-inch fire hydrant line and a 4-inch fire sprinkler service.

FDOT-controlled roadway work

The operation required nighttime construction under strict FDOT requirements, including roadway access, excavation, traffic constraints and restoration obligations.

Miami-Dade WASD coordination

Water utility work was executed around WASD requirements for tapping, installation, inspection, testing and acceptance.

Field leadership

Francisco Rubio has coordinated the field operation through excavation, main-tap work, utility installation, inspections, crew sequencing and restoration.